A list of terms, keywords, abbreviations, and acronyms used in reporting system.
Data Formats
Standardized formats used for data representation and exchange in project reporting systems.
Types of Duration in Scheduling
Different duration types used in project scheduling including original duration, actual duration, and remaining duration.
Schedule Version
An umbrella term for a schedule submission such as a baseline schedule, a schedule update, a recovery schedule, or a scenario planning schedule.
Variation
A change or deviation from the originally planned scope, time, or cost in a construction project.
Delay
An event or condition that extends the time required to complete an activity or the project beyond its planned finish date.
Delay Analysis Methodology
Systematic approaches used to identify, quantify, and apportion responsibility for delays in construction projects. Common methodologies include As-Planned vs. As-Built, Impacted As-Planned, Collapsed As-Built, and Time Impact Analysis.